Posted by allenb on 02/14/2012 19:05
#1
Looking for suggestions for 2" diameter flexible high temp ducting to go between connection on fill funnel stack and roaster base connection. With my setup on the Easydrum roaster the front plate (with funnel) slides forward an inch and the roaster body tilts about 20 degrees for dumping so I can't use rigid sheet metal ducting.
I was thinking of using sealtite flex conduit without outer plastic wrap but the interlocking spiral includes a cloth string of sorts to tie it together.
Allen